NO |
PROJECT NAME |
YEAR |
OWNER |
CONTRACT |
1 |
Structural
Design Judiciary Building, Batam |
2004 |
Industrial
Development Authority of Batam Island - Batam Centre |
JO.
LAPI -ITB |
2 |
Structural
Design of 9 Story Building Polytechnic Institute,
Batam |
2004 |
Industrial
Development Authority of Batam Island - Batam Centre |
JO.
LAPI -ITB |
3 |
Structural
Design of International School of Intelligence,
Batam |
2004 |
Intelligence
Foundation of Republik Indonesia |
JO.
LAPI -ITB |
4 |
Seismic
Hazard Analyisis for Nuclear Research Reactor-BATAN,
Bandung |
2003 |
BATAN,
Bandung |
JO,
Vulkanologi |
5 |
Optimizing
Study and Land Use Design of 1,000 hectares of
Mainfield Office and Camp Facilities, Pertamina-PT
Bumi Siak Pusako, Zamrud, Riau |
2003 |
PT
Bumi Siak Pusako Pertamina Hulu (BOB) |
084/BOB/TP/LAPI-ITB/03
April, 15th 2003 |
6 |
Investigation
and Detailed Design of Leakage Problem Reparation on
Sasana Budaya Ganesa Conventon Center, Bandung |
2003 |
Sasana
Budaya Ganesha - ITB |
001-SPK/BP-SBG/VII/03
July, 4th 2003 |
7 |
Strengtening
and Retrofitting of Heritage Building of Bank of
Indonesia Museum, Jakarta |
2003 |
Bank
Indonesia |
5/23/DLP/PrLJ
January, 16th 2003 |
8 |
Investigation
and Design of Vault Dewatering System of Bank
Indonesia District Office, Denpasar - Bali |
2002 |
Bank
Indonesia |
4/290/DLP/PrLJ
October, 23th 2002 |
9 |
Lifting, Retrofitting, and Strengthening of Outfall Concrete Bridge, Suralaya Power Plant
|
2002 |
PT Indonesia Power |
86.Pj./061/IP/2002 June, 12th 2002 |
10 |
Strengthening and Retrofitting of Four Story Non Uniformly Settled Building, Denpasar - Bali
|
2002 |
PT Anugrah Jaya Perkasa |
071/PPI-SPM/V/2002 May, 31th 2002 |
11 |
Saint Carolus Senior High School, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
12 |
Auditorium of Province Government, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
13 |
District Office of Agriculture Department, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
14 |
Directorate of Social Politic Office Building, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
15 |
Radio Republic of Indonesia, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
16 |
Agriculture and Foot Plant Official Building, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
17 |
12 junior High School, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
18 |
Rehabilitation of M. Yunus General Hospital, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
19 |
Laboratory of Agriculture Department University of Bengkulu, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
20 |
Rehabilitation of Linguistic Laboratory University of Bengkulu, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
21 |
Rectory University of Bengkulu, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
22 |
Rehabilitation/Renovation of PT. Taspen’s (Persero) Ofice Building, Bengkulu Province- Indonesia.
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
23 |
District Office Building of Department of Mining and Energy, Bengkulu Province- Indonesia
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
24 |
Rehabilitation of DPRD Building Office, Bengkulu Province - Indonesia)
|
2002 |
National Institute for Land and Infrastructure Management (NILIM) Ministry of Land, Infrastructure and Transport |
2002/3/5 /NILIM and 041/PPI-EPM/III/2002 |
25 |
Geotechnical and topographical investigation; preliminary design of Electronic City Building, Artha-Gading Business Center, Jakarta
|
2002 |
PT Graha Sudirman Center |
MOU, March 2002 |
26 |
Design of Super and Substructure Office and Laboratory of PT Goldschmidt Sumi Asih-Bekasi
|
2001 |
PT Goldschmidt Sumi Asih |
027/GKS-GSA/VIII/2001 |
27 |
Redesign of Great Batam Mosque’s Structure
|
1999 |
Development Authority of Batam Island |
Sub. Contract Biro Arsitek Noe’man, PT in Bandung |
28 |
Engineering Consultant for The Renovation of The Center for Geological Research & Development Building on Jl. Soekarno-Hatta 730 Bandung
|
1999 |
General Secretary of the Ministry of Mining & Energy |
50/DIKS/VI/1999 June 28th, 1999 Sub. Contract LAPI-ITB |
29 |
Management Construction Consultant for The Renovation of The Center for Geological Research & Development Building on Jl. Soekarno-Hatta 730 Bandung
|
1999 |
General Secretary of the Ministry of Mining & Energy |
10/DIKS/VI/1999 Juni 1th, 1999 Sub. Contract LPM-ITB |
30 |
Additive Study of Fuel for motorcar
|
1999 |
The Secretary of Goverment’s Board of Directors for Pertamina (DKPP) |
96/S/DKPP/1999 April 7th, 1999 Sub Contract LAPI-ITB |
31 |
The Feasibility Study Stage II of Development & operational Plan for Coal Chanel & terminal in South Kalimantan
|
1998 |
The Commitee of Regional Development Plan; The Province of South Kalimantan |
07/XII/PAP/Fis/97 January 8, 1998 |
32 |
Detailed Design of 120,000 Mtpa Coal Briquetting Plant in Semarang, Central Java. (Architecture, Structure, Mechanical, Electrical, Geotechnical Investigation, and Mapping)
|
1998 |
Coal Briquete Development Project PT Tambang Batubara Bukit Asam |
036/K/PTBA-LAPI ITB/1998 |
33 |
Preliminary Design of Fairway and Barge Terminal Loading at Jorong, Coal Terminal, South Kalimantan
|
1997 |
Banpu Public Company Limited |
MOU |
34 |
Design of Candle Mill in Bekasi, East Java
|
1997 |
PT.Graha Kawula Sejahtera |
056//GKS/XI/1997 November 7, 1997 |
35 |
Phase I Pre-feasibilty Study for Development and Operation of Coal Canal Track and Terminal in South Kalimantan
|
1997 |
PT Indonesia Harbour III (PT. Pelabuhan Indonesia III) |
FA.040/5/14.A/P.III-97 October 31, 1997 Sub Contract LAPI-ITB |
36 |
Design, Construction, Operation, and Maintainance for Eight-year of Nickel Ore Shiploading Facility in UPN Gebe, Central Halmahera, North Maluku
|
1997 |
PT. Aneka Tambang (Persero) Tbk |
3530/912/DAT/1997 September 29, 1997 JO. PT Hardy and Kee Engineering |
37 |
Environmental Impact Analysis for Coal Mining
|
1997 |
PT. Antang Gunung Meratus |
045/AGM/V/1997 |
38 |
Coal Feasibilty Study in South Kalimantan
|
1997 |
PT. Antang Gunung Meratus |
045/AGM/V/1997 |
39 |
Detailed Design of 120,000 Mtpa Coal Briquetting Plant in Serang, West Java. (Architecture,Structure,Mechanical,Electrical, Geotechnical Investigation, and Mapping)
|
1997
|
Coal Briquete Development Project PT Tambang Batubara Bukit Asam
|
33/K/P2B2-LAPI/IX/1997 Sub Contract LAPI ITB
|
40 |
Coal Transportation Study in South Kalimantan
|
1996 |
PT. Baradatra Satrya |
MOU, October 28, 1996 |
41 |
Preliminary Design of Pomako Bridges, Irian Jaya
|
1996 |
PT. Freeport Indonesia Company |
MOU |
42 |
Planning and Design of Coal Haul Road from Sungkai to Marabahan
|
1996 |
PT. Baradatra Satrya |
MOU, May 7, 1996 |
43 |
Preliminary Design of Fiona Dam Improvement
|
1996 |
PT. International Nickel Indonesia (INCO) |
Purchase Order No.P04801, February 24, 1996. Sub Contract LAPI ITB |
44 |
Detailed Design of 120,000 Mtpa Coal Briquetting Plant in Gresik, East Java.
(Architecture,Structure,Mechanical,Electrical,Geotechnical Investigation, and Mapping)
|
1996 |
Coal Briquete Development Project PT Tambang Batubara Bukit Asam |
12/K/P2B2-LAPI/IV/96, April 8, 1996 Sub Contract LAPI ITB |
45 |
Infrastructure Design of UPEP Town Site
|
1996 |
PT. Aneka Tambang (Persero) |
540/0625/KTR/1996, February 2, 1996 Sub Contract PT. Sistekon |
46 |
Coal Transportation Study in Binuang, South
Kalimantan.
|
1995 |
PT. Baradatra Satrya |
MOU |
47 |
Underground Water Exploration for Coal Briquetting Plant in Gresik, East Java.
|
1995 |
Coal Briquete Development Project PT Tambang Batubara Bukit Asam |
29/K/P2B2-LAPI/XII/95, December 4, 1995 Sub Contract LAPI ITB |
48 |
Optimization Study on Power Reserve Planning for Power Supply System in Kalimantan
|
1995 |
Directorate General of Electricity and Energy,Department of Mines and Energy |
077/SPK/PSPKN/VIII/1995, August 23, 1995 Sub Contract LPM ITB |
49 |
Detail Design of UPEP Town Site
|
1995 |
PT. Aneka Tambang (Persero) |
3983/91/KTR/1995, September 29, 1995 Sub Contract PT. Sistekon |
50 |
Site Planning and Conceptual Design of UPEP Town Site
|
1995 |
PT. Aneka Tambang (Persero) |
1621/0625/OAT/1995, May 1, 1995 Sub Contract PT. Sistekon |
51 |
Structural Design of 44-storey Matahari Tower Building, Karawaci, Tangerang
|
1995 |
LIPPO VILLAGE Group |
Sub Contract PT. Bita Enarcon Engineering Bandung |
52 |
Structural Design of N-3 Super Car Park Podium, Karawaci, Tangerang
|
1994 |
LIPPO VILLAGE Group |
Sub Contract PT. Bita Enarcon Engineering Bandung |
53 |
Strategy Arrangement for Public Water Supply Program
|
1994 |
Directorate General of Waterworks Department of Public Works |
22/PKK/PS/Bpp.1994, Juli 23, 1994 Sub Contract PT. Kogas Driyap Consultants |
54 |
Study on the Energy Efficient Office Buildings
|
1994 |
Directorate General of Electricity and Energy Development, Department of Mines and Energy |
004/S.Per/PPKE/VII/94, Juli 22, 1994 Sub Contract PT. Properindo Jasatama |
55 |
Optimization Study on Power Reserve Planning of Electric Power Supply System in Sumatera1994
|
|
Directorate General of Electricity and Energy Development, Department of Mines and Energy |
161/PSPKN/94, Juni 30, 1994 Sub Contract PT. SPEKTRA ADHYA PRASARANA |
56 |
Environmental Impact Analysis for Coal Briquetting Plant Project in Serang, West Java, and in Gresik, East Java.
|
1994 |
Coal Briquete Development Project PT Tambang Batubara Bukit Asam (Persero) |
021/K/P2B2/LAPI/VII/94, Juli 26, 1994 Sub Contract LAPI-ITB |
57 |
Geotechnical Investigation for Coal Briquetting Plant Project in Gresik, East Java.
|
1994 |
Coal Briquete Development Project PT Tambang Batubara Bukit Asam (Persero) |
021/K/P2B2/LAPI/VII/94, Juli 26, 1994 Sub Contract LAPI-ITB |
58 |
Planning and Design of Coal Briquetting Plant in Serang, West Java, and in Gresik, East Java.
|
1994 |
Coal Briquete Development Project PT Tambang Batubara Bukit Asam (Persero) |
021/K/P2B2/LAPI/VII/94, Juli 26, 1994 Sub Contract LAPI-ITB |
59 |
Structural Design of the Great Batam Mosque, Batam |
1994 |
Batam Industrial Development Agency |
Sub Contract PT. Biro Arsitek Noe’man, Bandung |